A method and assembly for operating at least two lifting gears in a group operation, where each lifting gear has a hoist via which a respective cable or chain can be raised or lowered. The hoists are first operated in a synchronous operating mode to perform a common lifting procedure to move a load supported by the hoists. At least one of the hoists involved in the common lifting procedure is then deactivated to switch from the synchronous operation into an individual operation or a multi-operation, with at least one of the hoists remaining activated to carry out a lifting or lowering process relative to each deactivated hoist. A load value is then determined for the at least one deactivated hoist and compared to a predetermined threshold value of the at least one deactivated hoist.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    VERFAHREN ZUM BETREIBEN VON MINDESTENS ZWEI HEBEZEUGEN IN EINEM GRUPPEN-BETRIEB UND ANORDNUNG MIT MINDESTENS ZWEI HEBEZEUGEN


    Weitere Titelangaben:

    METHOD FOR OPERATING AT LEAST TWO LIFTING DEVICES AS A GROUP, AND ASSEMBLY COMPRISING A LEAST TWO LIFTING DEVICES
    PROCÉDÉ POUR FAIRE FONCTIONNER AU MOINS DEUX APPAREILS DE LEVAGE EN GROUPE, ET ENSEMBLE COMPORTANT AU MOINS DEUX APPAREILS DE LEVAGE


    Beteiligte:
    BEHNKE KLAUS (Autor:in)

    Erscheinungsdatum :

    04.09.2019


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Deutsch


    Klassifikation :

    IPC:    B66C Krane , CRANES





    Anordnung aus mindestens zwei elektrischen Traktionsenergiespeichern

    HESSEL MARCEL / KIGIN ERDOGAN / JOHN DENNIS | Europäisches Patentamt | 2016

    Freier Zugriff

    ANORDNUNG AUS MINDESTENS ZWEI ELEKTRISCHEN TRAKTIONSENERGIESPEICHERN

    HESSEL MARCEL / KIGIN ERDOGAN / JOHN DENNIS | Europäisches Patentamt | 2016

    Freier Zugriff

    Über die Getriebereibung von Hebezeugen

    Budde, Hermann | GWLB - Gottfried Wilhelm Leibniz Bibliothek | 1924