This project addressed selected logistic support requirements needed to sustain SH-2F helicopters aboard the new class ship, Guided Missile Frigate (FFG-7). The study identified and documented air/ship interface requirements, ground support equipment, test equipment requirements, packup kit range and depth, weight and cube of spares and repair parts, Individual Material Readiness List, mooring aids, and equipment (Allowance Equipage List), and recommended additional evaluation of a flight deck communication system (MAGnetic Induction Communication). A Logistic Support Conference defined logistic issues requiring resolution. The study group, coordinated by the NAILSC team, proposed and assigned action on each item. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Guided Missile Frigate (FFG-7) Air Detachment Requirements


    Beteiligte:
    A. V. Liberti (Autor:in) / C. W. Chandler (Autor:in)

    Erscheinungsdatum :

    1976


    Format / Umfang :

    173 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch