The Ballistic Missile Office (BMO) has developed and employed a procedure to insure the flight readiness of a Peacekeeper guidance system. The goals of this additional review procedure (over and above acceptance testing) are to minimize the risk of the guidance system failure and/or achieving substantially less than the designed accuracy. The roles, mission and interaction of teams of personnel from seven associate contractors are discussed using flow diagrams. The paper also includes methods used to identify and resolve areas of concern as well as examples of actual concerns discovered. The scope is discussed, including both the various technical disciplines involved and the lowest level of build and test areas reviewed. Resulting build and test improvements are shown.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Peacekeeper: guidance system Flight Readiness Review


    Weitere Titelangaben:

    Peacekeeper: Fuehrungssystem mit Uebersicht der Flugbereitschaft


    Beteiligte:
    Knight, D.S. (Autor:in) / Harrington, E.V. (Autor:in)


    Erscheinungsdatum :

    1983


    Format / Umfang :

    5 Seiten, 5 Bilder, 1 Tabelle


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Peacekeeper - Guidance system flight readiness review

    KNIGHT, D. / HARRINGTON, E. | AIAA | 1983


    Peacekeeper flight termination ordnance system

    Ramsey, James / Sessler, Donald / Yang, Lien | AIAA | 1995


    Panzerfahrzeug Peacekeeper

    General Motors | Kraftfahrwesen | 1980



    Program overview of peacekeeper flight test planning

    WOODBURY, S. / GORMAN, R. | AIAA | 1983