The object of this test was to operationally check the airborne fuel tank pressurization system under the simulated booster condition, that exists just prior to and at booster separation. (Author)
Fuel Tank Pressurization 'B' Configuration
1958
7 pages
Report
No indication
English
Tank pressurization controller and tank pressurization system
European Patent Office | 2015
|