The entire engineering model is being concluded in the shuttle configuration. The flight model components are extensively included in the shuttle configuration and will not be changed until after a binding Atlas/Centaur (A/C) booster decision for the A/C configuration. The urgent projects for the altering of the shuttle configuration on the A/C configuration must be carried out before a binding Atlas/Centaur booster decision is completed. All other modification projects are being delayed until the presentation of a binding booster decision.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    DFVLR Roentgen satellite


    Publication date :

    1987-06-01


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English