Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Why Does a Railway Infrastructure Company Need an Optimized Train Path Assignment for Industrialized Timetabling?


    Contributors:

    Conference:

    Operations Research Proceedings 2014: selected papers of the Annual International Conference of the German Operations Research Society (GOR)



    Publication date :

    2014-01-01


    Size :

    6 pages



    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English





    What Are New Insights Using Optimized Train Path Assignment for the Development of Railway Infrastructure?

    Pöhle, Daniel / Feil, Matthias | British Library Conference Proceedings | 2014


    Train timetabling during infrastructure maintenance activities

    Arenas, Diego / Pellegrini, Paola / Hanafi, Said et al. | IEEE | 2016


    Railway timetabling: a maximum bottleneck path algorithm for finding an additional train path

    Ljunggren, Fredrik / Persson, Kristian / Peterson, Anders et al. | Springer Verlag | 2021

    Free access