INFORMATION GAIN-BASED INSPECTION SCHEDULING FOR FATIGUED AIRCRAFT COMPONENTS (AIAA 2017-1565)
AIAA non-deterministic approaches (Conference)
2017-01-01
9 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Inspection Policies in Service of Fatigued Aircraft Structures
Springer Verlag | 2011
|Fuzzy Gain-Scheduling Applied for a Very Flexible Aircraft (AIAA 2018-1868)
British Library Conference Proceedings | 2018
|DataCite | 1875
AIRCRAFT TOUCHDOWN SPEED ESTIMATION (AIAA 2017-4154)
British Library Conference Proceedings | 2017
|