Assessment of iGMAS Final Combination with Nearly Three-Year Solutions
China Satellite Navigation ; 2018 ; Harbin, China
2018-01-01
12 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
An Initial Analysis and Assessment on Final Products of iGMAS
British Library Conference Proceedings | 2016
|Analysis of BDS-2+BDS-3 Combination Real-Time Time Transfer Based on iGMAS Station
British Library Conference Proceedings | 2019
|Precision Evaluation and Consistency Analysis of iGMAS Orbit and Clock Products
British Library Conference Proceedings | 2016
|Performances Assessments for GNSS/BDS-3 Satellites On-Board Clock with Long-Term iGMAS Products
Springer Verlag | 2022
|Time Transfer Analysis of GPS- and BDS-Precise Point Positioning Based on iGMAS Products
British Library Conference Proceedings | 2018
|