Access

    Access via TIB

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    The Supervisory of 202 m-span Concrete Filled Steel Tubular Tied Arch Bridge


    Contributors:
    Shengshan, P. (author) / Cailiang, H. (author) / Zhe, Z. (author)

    Published in:

    Publication date :

    2004-01-01


    Size :

    4 pages



    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    Unknown


    Classification :

    DDC:    629.04





    Cable Construction and Its Analysis of Concrete-filled in Steel Tubular Arch Bridge

    Liang, C. / Chunsheng, L. / Huijun, W. | British Library Online Contents | 2003


    Long span tied arch in elevated highway

    Friedland, J.M. | Engineering Index Backfile | 1939


    Seismic behavior of concrete filled steel tubular arch structures

    Feng, X. / Kunnath, S. K. / Haowu, L. | British Library Online Contents | 2005