Taking the specific condition of the initial operation of the Chengdu Metro Line 1 into consideration, this paper analyzes the prediction of passenger volume systematically and objectively and makes some comments on the method of passenger flow forecast. In terms of operation, we use comparison to analyze the reasons for the differences between the actual passenger flow volume and the prospective one. We point out that the factors which should be taken into consideration should depend on the specific aims of passenger volume prediction. In the end we offer some suggestions in the hope of improving the operation of Chengdu metro company and the methods of passenger flow forecast, expecting that it can provide a reference to the metro operation and construction in the future.
Passenger Volume of the Chengdu Metro Line 1 Analysis
Third International Conference on Transportation Engineering (ICTE) ; 2011 ; Chengdu, China
ICTE 2011 ; 1095-1100
2011-07-13
Conference paper
Electronic Resource
English
Metro Passenger Volume Prediction
DataCite | 2024
|The Strategy of Chengdu Metro Management and Development
ASCE | 2011
|