Taking the specific condition of the initial operation of the Chengdu Metro Line 1 into consideration, this paper analyzes the prediction of passenger volume systematically and objectively and makes some comments on the method of passenger flow forecast. In terms of operation, we use comparison to analyze the reasons for the differences between the actual passenger flow volume and the prospective one. We point out that the factors which should be taken into consideration should depend on the specific aims of passenger volume prediction. In the end we offer some suggestions in the hope of improving the operation of Chengdu metro company and the methods of passenger flow forecast, expecting that it can provide a reference to the metro operation and construction in the future.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Passenger Volume of the Chengdu Metro Line 1 Analysis


    Contributors:
    Xiao, Jingwen (author) / Li, Hui (author)

    Conference:

    Third International Conference on Transportation Engineering (ICTE) ; 2011 ; Chengdu, China


    Published in:

    ICTE 2011 ; 1095-1100


    Publication date :

    2011-07-13




    Type of media :

    Conference paper


    Type of material :

    Electronic Resource


    Language :

    English




    Metro Passenger Volume Prediction

    Gao, Fuchen | DataCite | 2024



    The Strategy of Chengdu Metro Management and Development

    Zeng, Rongdi / Yao, Ying / Cheng, Bo | ASCE | 2011


    LightGBM-based model for metro passenger volume forecasting

    Zhang, Youyang / Zhu, Changfeng / Wang, Qingrong | IET | 2021

    Free access

    Direction of Passenger Transportation Development in Chengdu

    He, Shan / Huang, Cheng / He, Lin et al. | ASCE | 2013