The construction of Cheng Guan high-speed railway can dramatically improve the transportation construction along areas, perfect the transport network system, improve travelling resources, and speed up urbanization. Train routing plans provide the operation section and exit station, rational and feasible routing plans association to arrange train transportation capacity is a regular method to use limited resources fully. Analyzing the characteristics of various routing plans above municipal traffic and based on the setting principles of operation routing plan, the paper comprises the multiple routing plans of Cheng Guan line from operation organization, the level of passenger service, passenger organization and quantity of vehicle and proposes the implemented recommendations for the future operation routing plan of Cheng Guan high-speed railway.
Discussion of the Train Operation Routing Plan Mode of Cheng Guan Railway
Fourth International Conference on Transportation Engineering ; 2013 ; Chengdu, China
ICTE 2013 ; 2051-2058
2013-10-09
Conference paper
Electronic Resource
English
Engineering Index Backfile | 1937