Completion of main trunk railroad, 680 mi long, connecting Hankow with Canton; construction of 250-mi section from Shaochow to Lochang presented difficult problems because of inaccessibility and ruggedness of country; work started at both ends; foreign materials used; costs totaling about $43,000,000.
Constructing Canton-Hankow railway
Civ Eng (NY)
Civil Engineering (New York) ; 5 , n 8
1935
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Constructing Canton-Hankow Railway
Engineering Index Backfile | 1935
|Engineering Index Backfile | 1936
Engineering Index Backfile | 1910
Re-opening Canton-Hankow Railway
Engineering Index Backfile | 1946
|New Chinese railway from Canton to Hankow
Engineering Index Backfile | 1899