In order to handle increasing traffic on more effective basis, 3 mi. of quadruple track between Maldonado Junction and Retiro, Buenos Aires, have been re-signaled on low-pressure electro-pneumatic system; arrangement of signaling between Maldonado Junction and Retiro station before and after rearrangement of tracks.
Re-signalling Buenos Aires approach lines, Central Argentine Railway
Ry Gaz
Railway Gazette and Railway News ; 51 , n 22
1929
4 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Operating results of the Buenos Aires suburban electrification of the Central argentine railway
Engineering Index Backfile | 1929
|Operating results of the Buenos Aires suburban electrification of the Central argentine railway
Engineering Index Backfile | 1929
|Automatic signalling on Central Argentine railway
Engineering Index Backfile | 1932
New branch lines, Central Argentine railway
Engineering Index Backfile | 1932
New Buenos Aires terminal, Buenos Ayres Great Southern Railway
Engineering Index Backfile | 1925