Harland and Wolff have completed motorship for intermediate and East Coast services of Union-Castle Mail Steamship Co.; length 485 ft.; gross tonnage, 11,951 tons; ship is divided into nine water-tight compartments, and double bottom, extending whole length of ship, is arranged to carry water ballast, oil fuel, and fresh water; propelling machinery consists of two sets of single-acting four-stroke Diesel engines of Harland-B and W type. (see also Engineering, vol. 128, no. 3333, Nov. 29, 1929, pp. 715-716; Brit. Motor Ship, vol. 10, no. 117, Dec. 1929, pp. 330-333, 6 figs.; and Shipbldg. and Shipg. Rec., vol. 34, no. 25, Dec. 19, 1929, pp. 732-735)
Twin-screw motorship "Llangibby castle"
Mar Engr Motorship Bldr
Marine Engineer and Motorship Builder ; 52 , n 627
1929
3 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Twin-screw motorship "Llangibby castle"
Engineering Index Backfile | 1929
Twin-screw motorship "Llangibby castle"
Engineering Index Backfile | 1929
Twin-screw motorship "Llangibby castle"
Engineering Index Backfile | 1929
Twin-screw passenger motorship "winchester castle"
Engineering Index Backfile | 1930
Twin-screw passenger motorship "winchester castle"
Engineering Index Backfile | 1930