Importance and requirements of automatic checkout and test system for Saturn V space vehicle developed by NASA to meet its goal of placing men on moon before 1970; exclusive of spacecraft, Saturn V consists of three rocket-propelled stages (S-IC, S-II, S-IVB) and Instrument Unit (U); checkout systems for these individual stages.
Automatic checkout systems for stages of Saturn V manned space vehicle
IEEE Int Conven Rec
IEEE International Convention Record ; 13 , Part 4
1965
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Saturn systems automatic checkout.
NTRS | 1964
|Automatic checkout in the Saturn program.
NTRS | 1967
|Apollo-saturn v prelaunch checkout operations.
NTRS | 1965
|