Methods and equipment used on one railroad for renewing average of 900 to 1000 ft of track per hr; track raising and tie renewal gang utilizes 10 machines and 27 men including foremen.
Production through automation
Ry Track Structures
Railway Track and Structures ; 51 , n 3
1955
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Automation in windscreen production
Tema Archive | 1997
|Automation trotz Lean-Production
Automotive engineering | 1992
|Bringing automation to production
Automotive engineering | 1986
|Automation whirlwind sweeps through BAE
Tema Archive | 1985
|Quality Axle Assembly Through Automation
SAE Technical Papers | 1966
|