Complications involved in underpinning viaduct at Detroit, main feature of which was driving 1200 steel piles to depths of 90 ft or more.
Sewer construction affects tracks on three levels
Ry Age
Railway Age ; 104 , n 17 ; p 728-731
1938
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Additive Construction: Digital Construction Technology for Polylactide Railroad Tracks
ASCE | 2025
|Temporary sewer line carrying device for municipal construction
European Patent Office | 2023
|Construction and maintenance of street-railway tracks
Engineering Index Backfile | 1899
|Prefab tracks speed construction of Swaziland railway
Engineering Index Backfile | 1965
|