At estimated cost of $11,000,000, two tunnels are to be built to facilitate movement of traffic at St Remi Street and Atwater Avenue; plans for St Remi project provide for two roadways 24 1/2 ft wide with vertical clearance of 14 ft; 8-ft sidewalk for pedestrians; length of tunnel will be 485 ft while oa length will be 2500 ft including approaches; plans for Atwater project are not yet complete.
New vehicular tunnels for Montreal
Can Transportation
1949
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Vehicular tunnels in United States
Engineering Index Backfile | 1931
|Vehicular tunnels through missionary ridge
Engineering Index Backfile | 1928
|Method of operating Holland vehicular tunnels
Engineering Index Backfile | 1927
Electrical installations for vehicular traffic tunnels
Tema Archive | 1988
|Replaceable sectional paving for vehicular tunnels
Engineering Index Backfile | 1933
|