Problems encountered in Chicago's Halstead Street widening project; granite block pavement strips replaced by 10-in. reinforced concrete except in area between street car tracks; 12-ft sidewalks replaced by 7 1/2-ft walks; paver used in midst of dense traffic; mobile loaders working from portable batch plant speeded curb and walk work.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Too much traffic, too little cement


    Additional title:

    Roads Streets


    Contributors:

    Published in:

    Publication date :

    1949


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Methanol supplies:Too much or too little?

    Weismantel,G.E. | Automotive engineering | 1980


    Much stronger buildings at little extra cost

    Cartwright, F.P. | Engineering Index Backfile | 1930


    How much passenger traffic?

    Van Deusen, E.A. | Engineering Index Backfile | 1942