Description of installation of centralized traffic control on 137 mi of single track of Louisville and Nashville, between Louisville, Ky, and Henderson, which cuts 1 1/2 to 2 hr from running time of tonnage freight trains, and includes special construction features to provide protection of signal equipment against possible floods along Ohio river. (See also Ry Signaling v 40 n 12 Dec 1947 p 782-92)
C.T.C. down by Ohio
Ry Age
Railway Age ; 123 , n 21
1947
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1947
C.T.C. installed on Baltimore and Ohio
Engineering Index Backfile | 1934
C.T.C. installed on Baltimore and Ohio
Engineering Index Backfile | 1934
Engineering Index Backfile | 1943
Engineering Index Backfile | 1950
|