New works under construction include 1600 ft of deep water quay, providing three cargo berths, 3500 ft of quay wall, handling and storage facilities for logs and sawn timber, over 20 mi of sidings, 60,000 sq yd of roads and paved areas, road bridge, 42 electric cranes, and 70 acres of reclamation.
Takoradi Harbour extensions
Engineer
Engineer ; 193 , n 5012 ; p 254-255
1952
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1952
Engineering Index Backfile | 1930
Technical considerations on the Takoradi–Cairo air route of the Second World War
SAGE Publications | 2019
|Online Contents | 2000
Baikovo Harbour (Shumshu Is.) Harbour Circumstance
British Library Online Contents | 1995
|