Engineering details of vehicular subway which is now being constructed under Detroit River from Canadian to United States sides; work to be completed in 1930; distance from land shaft to land shaft is 4000 ft.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Progress on the Windsor-Detroit tunnel


    Additional title:

    Contract Rec



    Publication date :

    1928


    Size :

    3 pages


    Remarks:

    1 Fig.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Proposed Windsor-Detroit traffic tunnel

    Engineering Index Backfile | 1925


    Detroit/Windsor Tunnel Gets Major Rehab

    British Library Online Contents | 1994


    Detroit/Windsor restoration

    Sammut, P. | Tema Archive | 1994


    Tunnels planned from Windsor to Detroit

    Engineering Index Backfile | 1925