Standard joint has two Lorain bridge-type splice bars for 9-in. rail; these are held in place by twelve 1-in. ordinary steel bolts; before attaching plates, rails are butted together as close as possible; head of rail at joint is planed with planer.
Bolted rail joint in paved track
Elec. Traction
Electric Traction ; 24 , n 10
1928
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Paved-in light rail track constructions
Online Contents | 1994
Engineering Index Backfile | 1894
|Rail fastenings in paved streets
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1908
|Engineering Index Backfile | 1894
|