Describes widening of Stettin-Altdamm highway by 6 miles to make room for railway tracks; hydraulic-fill dredging methods used to build up swampy lowland; pile foundations for power poles; type of rails used, railroad crossings; overhead-line construction over bascule bridge.
Swampy ground. An electric street railway through the Oder valley swamp near Stettin
Eine Strassenbahn durch das Oderbruch
Verkehrstechnik ; 45 , n 1 ; p 1-5
1928
5 pages
10 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
The electric street railway at Stettin
Engineering Index Backfile | 1898
Center-entrance low-platform cars of stettin street railroad
Engineering Index Backfile | 1930
|Electric street railway tracks
Engineering Index Backfile | 1896
|The Wyoming valley electric railway
Engineering Index Backfile | 1894