Federal Highways Enabling Act passed Jan. 5, 1927; system inaugurated with Rio-Sao Paulo and Rio-Petropolis trunk lines; high standards of roadbuilding being followed; two main trunk lines aggregating 190 km. completed; maximum grade 6 per cent minimum radius of curve 50 m.; roadway width 8 m.
Trunk line construction on Brazilian National Highways
Eng. News-Rec
Engineering News Record ; 101 , n 19
1928
3 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Snow removal on trunk line highways
Engineering Index Backfile | 1918
|Snow removal on trunk line highways
Engineering Index Backfile | 1918
|Planning for future traffic on trunk highways
Engineering Index Backfile | 1916
Widening trunk lines vs. building parallel highways
Engineering Index Backfile | 1927
|Utilization of motor-truck trains in the maintenance of trunk highways
Engineering Index Backfile | 1912
|