Feb. 1928 n 2 p 39-43: Outstanding feature of Illinois Central installation is fact that no fixed wayside signals are used, these being removed at time engine cab signals were put into service; en-ginemen rely entirely upon cab signal indication in place of customary wayside signal; complete wiring diagram of engine lighting and automatic train-stop equipment; locomotive train-control equipment; equipment in cab; road operation. Mar. 1928 n 3 p 85-89: After-trip tests and other periodical inspections; testing equipment used; methods of record keeping; additional information relating to after-trip inspection is given as well as details of testing equipment used for this and other important tests; test loop construction; procedure in making electrical tests; phase relationship also checked; bench test rack; procedure in handling reports.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    I. C. train stop installation and maintenance


    Additional title:

    Ry. Elec. Engr


    Published in:

    Publication date :

    1928


    Remarks:

    15 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English