Facilities afforded by new elevator; storage and conveying facilities; there will be ample space alongside jetty for 4 ships, 2 on each, and it will be possible to load 4 vessels at same time; entire plant will be operated by electricity and will involve use of approximately 150 motors totaling 10,500 hp.
Improvements in port facilities at ingeniero white (Bahia Blanca), Argentina
Commerce Reports
1928
2 pages
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Argentine naval port near Bahia Blanca
Engineering Index Backfile | 1922
Environmental management of the industrial development of the Port of Bahia Blanca
British Library Conference Proceedings | 2001
|80,000-ton granary at Bahia Blanca
Engineering Index Backfile | 1933
Launching investigations and measurements of the twin-screw steamer "Bahia Blanca"
Engineering Index Backfile | 1912
|Modern wharf improvements and port facilities
Engineering Index Backfile | 1897
|