Description of construction work at seaport of Lobitos Oilfields, Ltd., in Peru; 4500 ft. from Mole to tanker moorings; 5000 ft. of pipe used, to allow for drift in launching; pipe used was 9-in. inserted-joint casing; connected on shore in five lengths, each on runway; ends plugged to utilize buoyancy; total working time of actual launching was 13 hours. (5 figs. partly on supp. plates)
Launching a 5000 ft. Submarine oil-loading line
Instn. Petroleum Technologists -- Jl
1928
6 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1930
|