July: One large shop equipped with largest appliances replaces nine older erecting shops; processing or belt system of building and repairing locomotives introduced; production and transport methods reorganized; time for heavy locomotive overhaul reduced to maximum of 12 working days; how engines enter and leave shop; progress office; controlling factor; recording system; sequence of operation. (See also - no. 583 Aug. pp. 277-290 no. 584 Sept., pp. 317-326, no. 585 Oct., pp. 361-364, no. 586 Nov., pp. 400-406, 412, no. 587 Dec pp. 448-456, 125 figs.)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Reorganization of crewe locomotive works, L.M.S.R.


    Additional title:

    Ry Engr


    Published in:

    Railway Engineer ; 49 , n 482


    Publication date :

    1928


    Size :

    20 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English







    The reorganization of Crewe Locomotive Works

    Beames, H.P.M. | Engineering Index Backfile | 1928


    The reorganization of Crewe Locomotive Works

    Beames, H.P.M. | Engineering Index Backfile | 1928