An account of various tests made during the first three years' working. Illustrates and describes the equipment and the operation. An underground system worked on the continuous current principle with third rail. (Serial. 1st part) (7000 w.)
The Central London railway
Trac Trans
1903
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1900
Engineering Index Backfile | 1900
Engineering Index Backfile | 1896
|Engineering Index Backfile | 1896
Engineering Index Backfile | 1903
|