Illustrates and describes equipment which will increase the present power supply 10 per cent. It includes a d. c. 2000-kw. turbo generator outfit to be added to the Dorchester station, a 875-kw. gas engine plant at Salem St. station, Medford; and a 700-kw. gas-engine plant for W. Somerville. (3000 w.)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    New power-station equipment of the Boston elevated railway company


    Additional title:

    St Ry Jour



    Publication date :

    1905


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English






    The harvard power station of the Boston Elevated Railway Company

    Weller, H.W. | Engineering Index Backfile | 1898


    The harvard power station of the Boston elevated railway company

    Weller, H.W. | Engineering Index Backfile | 1898