Studies on some hundred projects throughout United States showing that 17 per cent of time is lost because of insufficient supply and faulty operation of hauling equipment; intensive analysis of accumulated field records of production studies made on going projects by engineers of division of management of Bureau of Public Roads; causes of low production; hauling operations; plan of good yard layout; time analysis of turntable operation; hauling speeds; disadvantages of contract hauling. See also Engineering Index 1930, p. 1529. (see also - nos. 5, May 1931, pp. 50-51; Pub. Roads, vol. 11, no. 12, Feb. 1931, pp. 247-257 and 260, 9 figs. Contractors and Engrs. Monthly, vol. 22, nos. 5 and 6, May 1931, pp. 71-77, and June, pp. 55-59, 13 figs.)
Truck operation and production in concrete paving work
Construction Methods
Construction Methods ; 13 , n 6 ; p 52-55
1931
4 pages
16 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Truck operation and production in concrete paving work
Engineering Index Backfile | 1931
|Truck operation and production in concrete paving work
Engineering Index Backfile | 1931
|Batching plant in concrete paving work
Engineering Index Backfile | 1932
|Batching plant in concrete paving work
Engineering Index Backfile | 1932
|Engineering truck chassis and turnout paving and replacing engineering truck
European Patent Office | 2022
|