Studies on some hundred projects throughout United States showing that 17 per cent of time is lost because of insufficient supply and faulty operation of hauling equipment; intensive analysis of accumulated field records of production studies made on going projects by engineers of division of management of Bureau of Public Roads; causes of low production; hauling operations; plan of good yard layout; time analysis of turntable operation; hauling speeds; disadvantages of contract hauling. See also Engineering Index 1930, p. 1529. (see also - nos. 5, May 1931, pp. 50-51; Pub. Roads, vol. 11, no. 12, Feb. 1931, pp. 247-257 and 260, 9 figs. Contractors and Engrs. Monthly, vol. 22, nos. 5 and 6, May 1931, pp. 71-77, and June, pp. 55-59, 13 figs.)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Truck operation and production in concrete paving work


    Additional title:

    Construction Methods


    Contributors:

    Published in:

    Construction Methods ; 13 , n 6 ; p 52-55


    Publication date :

    1931


    Size :

    4 pages


    Remarks:

    16 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Truck operation and production in concrete paving work

    Anderson, A.P. | Engineering Index Backfile | 1931


    Truck operation and production in concrete paving work

    Anderson, A.P. | Engineering Index Backfile | 1931


    Batching plant in concrete paving work

    Anderson, A.P. | Engineering Index Backfile | 1932


    Batching plant in concrete paving work

    Anderson, A.P. | Engineering Index Backfile | 1932


    Engineering truck chassis and turnout paving and replacing engineering truck

    XU XIJIAN / LIN HONGWU / JIAO WEIGANG et al. | European Patent Office | 2022

    Free access