Design and construction of coaches used on new trains put into service during summer of 1964 and which will make Paris-Brussels run in 2 hr 30 min and Paris-Amsterdam run in 5 hr 20 min; coaches described include A2Ds cars with diesel-alternator group to produce all current required for air conditioning plant, lighting, kitchen equipment, etc, A8s coaches with center corridor, A8 coaches with wide corridor, A5 R kitchen cars and A3 R bar-coaches.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    New TEE trains hauled by multi-current electric locomotives (Paris-Brussels-Amsterdam)


    Additional title:

    Int Ry Congress Assn -- Monthly Bul


    Contributors:
    Robert, J. (author) / van Rijn, W. (author)


    Publication date :

    1964


    Size :

    33 pages


    Type of media :

    Report


    Type of material :

    Print


    Language :

    English


    Keywords :


    Fuel consumption of freight trains hauled by Diesel electric locomotives

    Radford,R.W. / CN Rail,Montreal,CA | Automotive engineering | 1983



    SEL for electrically hauled trains

    Estelles, H. / Belmar, F. / Gaja, E. et al. | Tema Archive | 1987



    Locomotive-hauled Trains or Multiple Units?

    Müller, Volker | IuD Bahn | 2001