Twelve articles presented. Electric Traction on Indian Railways H.D.AWASTY,1-7; Why Electrification, V.R.VAJRAMUSHTI, 9-12, 38; Railways Operating Performance during Second and Third Plans, J.N. MAJUMDER, K.B.KRISHNASWAMI, 13-15; Ancillary Works to Be Done before Introduction of 25 kV A.C. Traction, M.S.MOHAN, 17-20, 38; Power Supply for Electrification of Railways, B.V.S.RAO, 23-32, 60; Track Circuits on 25 kV A.C. Traction, P.C.GUPTA, 33-8; Selection and Specification of Materials for 25 kV A.C. Traction Overhead Equipment, M.B.RAO, 41-4, 52; Signalling and Telecommunication Problems Associated with A.C. Traction, I.B. BOSE, 47-52; Ignitron Rectifier Locomotives on Indian Railways, S.PRAKASH, 53-60; Maintenance Organisation for 25 kV A.C. Overhead Equipment on South-Eastern Railway, M.N.MUKHERJEE, 61-7, 71; Railway Electrification -- Organisational Set-Up, B.MITRA, 68-71; Structures for Overhead Equipment of 25 kV A.C. Electrification on Long Bridges, J.MAZUMDAR, 72-80.
Railway electrification special number
Indian J Power River Valley Development
1963
80 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1921
|Engineering Index Backfile | 1943
|Engineering Index Backfile | 1923
|Engineering Index Backfile | 1909
|Engineering Index Backfile | 1909
|