Construction of three underground railways by Tramways Company at cost of $65,000,000 contemplated.
Proposed subway plan for Montreal
Can. Engr
Canadian Engineer ; 59 , n 25
1930
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Wellington street subway, Montreal
Engineering Index Backfile | 1933
|Centralized control of Montreal subway
Engineering Index Backfile | 1967
|Engineering Index Backfile | 1936
|Montreal terminal plan approved
Engineering Index Backfile | 1929
A communication system custom designed for the Montreal metro rapid transit subway
Tema Archive | 1977
|