Subway reconstruction in which minimum height of 16 ft. 6 in. is to be obtained so as to admit double-deck cars; estimated cost of reconstruction $1,630,000.
London subway reconstruction
Tramway Ry. World
Tramway and Railway World ; 67 , n 8
1930
4 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1925
|Modernize London subway signal system
Engineering Index Backfile | 1931
|Modernize London subway signal system
Engineering Index Backfile | 1931
|Modernize London subway signal system
Engineering Index Backfile | 1931
|The first London tramway subway
Engineering Index Backfile | 1906