Results of studies by Division of Management of U. S. Bureau of Public Roads of highway production problems and methods of eliminating avoidable delays; cost of delays; method of handling bulk cement; average hauling cycle; shovel studies; improving blasting operations; effect of changes on production. Before Highway Conference at University Colorado.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Time studies of highway contract operations


    Additional title:

    Roads Streets


    Contributors:

    Published in:

    Publication date :

    1930


    Size :

    6 pages


    Remarks:

    8 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Determining Minimum Contract Time for Highway Projects

    Shr, Jin-Fang / Thompson, Benjamin P. / Russell, Jeffrey S. et al. | Transportation Research Record | 2000


    Efficiency studies of highway grading operations

    Thee, T.C. | Engineering Index Backfile | 1932


    Highway Maintenance by Contract

    Sharma, S. C. | British Library Conference Proceedings | 1999


    Dynamic Contract Time Determination System for Highway Projects

    Abdel-Raheem, Mohamed / Torres Cantu, Cuauhtemoc / Wang, Xiaohui | Transportation Research Record | 2020


    Highway maintenance by contract method

    Ryberg, W.E. | Engineering Index Backfile | 1931