Hundreds of rail ends, pounded down at joints, are rebuilt annually by fleet of electric welding units; average time for complete operation is 25 min. (See also Ry. Eng. and Maintenance vol. 26, no. 7, July 1930 pp. 286-289, 6 figs; and Contract Rec., vol. 44, no. 49, Dec. 3, 1930, pp. 1499-1501,6 figs)