Factors controlling assignment of 638 Greyhound Line Motor Coaches to their runs and stations; runs showing greatest amount of revenue are usually given best equipment; at Cleveland general despatch board shows where every coach and driver on system is operating; average 208 mi. per day per coach.
Putting equipment where it is needed
Ry. Age (Motor Transport Sec.)
Railway Age -- Motor Transport Section ; 89 , n 13
1930
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
IuD Bahn | 2009
|Engineering Index Backfile | 1926
|Engineering Index Backfile | 1954
Engineering Index Backfile | 1954
ULTRACAPACITOR - Where and when ever power needed
Tema Archive | 2010
|