Erection of superstructures of great separation project of Canadian National Railways' near Groveton, New Hampshire, consisting of two 108-ton precast reinforced concrete slabs by lifting them to their final position and completing installation within 24 hr, without interrupting train service.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Railroad bridge built of two 108-ton precast slabs


    Additional title:

    Eng News-Rec


    Contributors:

    Published in:

    Publication date :

    1938


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English