Operational requirements of Hinterrhein system of power stations, particularly as regards operation of transformers, main feature of which is compactness of their design necessitated by restrictions imposed on weight and dimensions by narrowness of railway and roads in this mountainous part of Switzerland; details of transport to site.
Transformers for first 380-kV installation in Switzerland at Sils Im Domleschg
Brown Boveri Rev
Brown Boveri Review ; 49 , n 6 ; p 237-241
1962
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Die Geologie der Tunnels Crapteig und Sils
Online Contents | 1994
|Eröffnung der N 13-Teilstrecke Rongellen-Thusis-Sils
Online Contents | 1996
|Methods, systems, and apparatus for synthetic instrument landing system (SILS)
European Patent Office | 2015
|Validation of a seamless development process for real-time ECUs using OSEK-OS based SILS/RCP
Automotive engineering | 2008
|