New 1840-ft tunnel paralleling old tunnel which had collapsed, was constructed in 120 days to end shutdown of railroad line between Parkersburg and Clarksburg, W Va; several old tunnels were bypassed and others enlarged to eliminate restrictions caused to piggyback trains by 18 low tunnels.
Fast tunneling salvages blocked railroad project
Eng News-Rec
Engineering News-Record ; 172 , n 9
1964
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Squeezing Salvages Oversize Seals
NTRS | 1990
|Sleeve puller salvages welded tubes
NTRS | 1980
|How navy salvages war equipment
Engineering Index Backfile | 1946
|Resin salvages gravel pack in offshore well
Tema Archive | 1991
|The operation of an automatically blocked single track railroad
Engineering Index Backfile | 1905
|