Toge quaywall on Southwest Harbor in Hamburg; system adapted was reinforced concrete construction on reinforced concrete piles and reinforced concrete sheet piling in front; illustrated description of design and construction. (See also - n 6 Mar 15 1937 p 81-6)
Toge quaywall on Southwest Harbor in Hamburg
Der Ausbau des Togkais am Suedwesthafen in Hamburg
Werft-Reederei-Hafen ; 18 , n 7
1937
5 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Electrification of the Usui-Toge railway
Engineering Index Backfile | 1914
|The electrification of the Usui-Toge railway, Japan
Engineering Index Backfile | 1914
The Usui Toge Railway of the Shin-etsu Line, 1893 - 1997
IuD Bahn | 1997
|Engineering Index Backfile | 1926
|The recent development of the harbor of Hamburg
Engineering Index Backfile | 1899