Construction of freeway with three separate roadways through Seattle, Wash; roadways have four lanes at maximum section including separate 4-lane roadway for reversible traffic flow; 8-lanes will cross Washington Ship Canal on upper deck of bridge, while reversible roadway will cross on lower deck; deck type cantilever bridge with 552 ft main span will cost $16 million; right of way considerations; construction of scale model of bridge helped design and public relations.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Here's how to handle rush-hour traffic


    Additional title:

    Eng News -- Rec


    Published in:

    Publication date :

    1958


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Cost of accommodating rush-hour traffic

    Watson, H. | Engineering Index Backfile | 1932


    Robot rush hour

    Miller, I. | IET Digital Library Archive | 2007


    MASS TRANSIT RUSH HOUR TRAFFIC BOTTLENECK UNCORKER WATER SLIDE

    STAUFFER DAVID WILLIAM | European Patent Office | 2016

    Free access

    Mass transit rush hour traffic bottleneck uncorker water slide

    STAUFFER DAVID WILLIAM | European Patent Office | 2019

    Free access

    Rush Hour in the Eurotunnel

    Online Contents | 1995