Method used by Northern Pacific railroad to install continuous thermit welded rails in Bazeman and Blossburg tunnels, Mont; rails 3783 and 4017 ft long.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Butt-welds rails in 4,000-ft. lengths for two tunnels


    Additional title:

    Ry Eng Maintenance


    Published in:

    Publication date :

    1937


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Southern butt-welds rails in track

    Engineering Index Backfile | 1939


    Milwaukee butt-welds rails for special locations

    Engineering Index Backfile | 1965


    Butt-welding of railroad rails

    Cummins, R.R. | Engineering Index Backfile | 1938


    Lengthening rails by Butt welding

    Ryan, L.C. | Engineering Index Backfile | 1930


    Butt-welding of railroad rails

    Cummins, R.R. | Engineering Index Backfile | 1938