Details of d-c powered 48-passenger motor coach mounted on two motor bogies which carry combined rack and adhesion drives; motor coach trains permit reduction in running time from 32 to 22 min, as against locomotive hauled trains, for run from Interlaken to Lauterbrunnen and from 53 to 58 min from Interlaken to Grindelwald.
Motor-coaches of bernese oberland railways for adhesion and rack service
Brown Boveri Rev
Brown Boveri Review ; 36 , n 10/11
1949
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The new motor coaches of the Montreux-Bernese Oberland railway
Engineering Index Backfile | 1925
The Montreux-Bernese Oberland electric railroad
Engineering Index Backfile | 1909
|New motor coaches for Fribourg and Montreux-Oberland Bernois Railways
Engineering Index Backfile | 1944
|Six-axle locomotives of Montreux-Bernese Oberland Railway
Engineering Index Backfile | 1933
|Rolling stock of electric railway on montreux-bernese oberland
Engineering Index Backfile | 1926
|