Three years of intensive railroad and port construction in Liberia have opened up one of richest lodes of iron ore available to Western smelters; Raymond Inter national (Liberia) Ltd, contracted to build 165-mi railroad and deep water port needed to develop Nimba Mountain deposit; deposit is so rich that it needs no concentration or reduction but is run through crushers at open pit and sent on 2-mi conveyor to rail head.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Port and railroad unlock Liberia's iron ore deposits


    Additional title:

    Eng News-Rec


    Published in:

    Engineering News-Record ; 172 , n 19 ; p 34-36


    Publication date :

    1964


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    The port terminal railroad

    Allin, B.C. | Engineering Index Backfile | 1929


    Railroad service of port of stockton

    Allin, B.C. | Engineering Index Backfile | 1932


    UNLOCK LEVER DEVICE

    IWASA KAZUYA / YAMAKAWA YASUHIRO | European Patent Office | 2015

    Free access

    Crews race to complete port, railroad

    Ritter, Jr., L.J. | Engineering Index Backfile | 1960


    CANOPY Unlock Thruster

    A. Benditt / C. S. Sterrett | NTIS | 1965