Terrain involved in experimental pavement design is essentially marshland; route is heavily traveled carrying approximately 80,000 vehicles daily, of which 17% are in heavy truck category; over 42-mo period of operation composite pavement has performed in accordance with design objectives; there has been average total settlement of 0.06 ft in this period, most of which occurred within first 18 mo of service. (49338)
Experimental composite pavement in New Jersey
Highw Res Rec
Highway Research Record ; n 239
1968
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pavement Design Optimisation at Jersey Airport
British Library Conference Proceedings | 2001
|PART 1 - PAVEMENT MANAGEMENT - Cash Flow Control of New Jersey Interstate Needs
Online Contents | 2006
|Long term performance of an experimental composite pavement
TIBKAT | 1972
|3-foot thick flexible pavement design alternate planned for New Jersey Turnpike
Engineering Index Backfile | 1950
|