Major scheme of improvement to docks includes lead-in jetty constructed to facilitate movement of ships entering lock to docks; pumping station was built to house 2 impounding pumps of 5-ft diam, and 2 h-p ram-pumps for hydraulic system at lock; methods of overcoming various difficulties encountered during progress of works are described.
Swansea docks-entrance works
Instn Civ Engrs -- Proc
1963
24 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1961
Southampton docks extension works
Engineering Index Backfile | 1929
Southampton docks improvement works
Engineering Index Backfile | 1940
|Half-shaft manufacture at the Ford works at Swansea
Tema Archive | 1975
|Engineering Index Backfile | 1957