At North American Aviations Texas plant, power outlets are now located directly on planes under construction and fed from overhead trolley ducts; net result was saving of 20 to 30 min per man per shift.
Power outlets speed plane assembly
Elec Contracting
Electrical Contracting ; 44 , n 3 ; p 70-71 + 119
1945
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
STANDARD FOR CIGAR LIGHTERS & POWER OUTLETS
SAE | 1998
Standard for Cigar Lighters & Power Outlets
SAE | 2014
Power control system and method for vehicle power outlets
European Patent Office | 2017
|